1.工程建設(shè)英語口語句子
1、What is the installation elevation of this pipeline?
這條管線的安裝標(biāo)高是多少?
2、This pipeline will be installed on the No.8 pipe rack.
這條管線將安裝于八號(hào)管廊架上。
3、The transfer medium in this pipeline is liquid ammonia (process air, soft water, alkali liquor, acidic gas).
這條管線的輸送介質(zhì)為液氨(工藝空氣、軟水、堿液、酸性氣體)。
4、This is a gate valve (check valve, butterfly valve, cut-off valve, magnetic valve, remote valve, relief valve, throttle valve, cock).
這是一個(gè)閘閥(止回閥、蝶閥、切斷閥、電磁閥、遙控閥、安全閥、節(jié)流閥、旋塞)。
5、Please explain the method of field test and flushing (blowing off )of the pipelines.
請(qǐng)說明管線的現(xiàn)場(chǎng)試驗(yàn)和沖洗(吹凈)方法。
6、We shall conduct the clean water for the hydrostatic test of the austenitic stainless steel pipe.
我們將為奧氏體不銹鋼管的水壓試驗(yàn)引進(jìn)凈水。
7、We need a piping material list (list of piping support, bill of welding rod).
我們需要一份配管材料表(管架一覽表、焊條明細(xì)表)。
8、The welding (heat treatment) of pipes have been carried out with incorporated programming.
管子的焊接(熱處理)現(xiàn)已按照編寫的程序完成。
9、We can carry out various treatment for the inner surface of pipes, such as sanding, chemical pickling, purging and passivation.
我們可以進(jìn)行管子內(nèi)壁的各種處理,諸如:噴砂、化學(xué)酸洗、沖洗和鈍化。
10、The outer surface of this pipeline will be painted in green (red, yellow, blue, white, black, grey, brown) color.
這條管線的外表面將涂刷綠(紅、黃、藍(lán)、白、黑、灰、棕)色。
2.工程建設(shè)英語口語句子
1、Pay attention to safety!
注意安全。
2、Put on your safety helmet, please.
請(qǐng)戴上安全帽!
3、Danger! Look out! Get out of the way.
危險(xiǎn)!當(dāng)心!快躲開!
4、Here is our pipe prefabrication workshop (steel structure fabrication shop, machine shop, boiler room, air compressor station, concrete mixing unit).
這里是我們的管道預(yù)制車間(鋼結(jié)構(gòu)制作廠、機(jī)械加工車間、鍋爐房、空氣壓縮機(jī)站、混凝土攪拌裝置)。
5、I am sorry, do not touch this, please.
很抱歉、請(qǐng)勿觸動(dòng)!
6、Do not touch that paint, it is wet.
油漆未干,請(qǐng)勿觸碰。
7、Smoking and lighting fires are strictly forbidden at here.
這里嚴(yán)禁煙火。
8、Look at the sign, danger keep out.
注意標(biāo)牌,危險(xiǎn)勿進(jìn)。
3.工程建設(shè)英語口語句子
1、The design of the process piping is performed directly on a model of the project.
工藝配管的設(shè)計(jì)是直接按照工程項(xiàng)目的一個(gè)模型完成的。
2、The model is an actual working tool for piping.
模型是配管用的實(shí)際工具。
3、Piping erection work include: prefabrication, placing, aligning, welding and bolting.
管道安裝工作包括:預(yù)制加工、安置、對(duì)準(zhǔn)、焊接和連接。
4、We can perform the pipe by following operations: cutting and mechanical chamfering, manual and automatic welding.
我們可以對(duì)管子進(jìn)行下列預(yù)制加工:切割和機(jī)械加工坡口,手工和自動(dòng)焊接等。
5、The computer generates isometric drawings and prints out bill of materials.
計(jì)算機(jī)繪出管道空視圖,并打印出材料明細(xì)表。
6、Seamless steel tube is made in sizes for 1/8 to 24 inches.
無縫鋼管制作的尺寸從八分之一寸到二十四寸。
7、Spiral-welded steel pipe is available in sizes from 6 to 36 inches.
螺旋焊接鋼管的尺寸從六寸到三十六寸。
8、Two types of end are standard on steel pipes and fittings, that is flanged and screwed.
鋼管和管件有兩種標(biāo)準(zhǔn)端部型式,即:法蘭和絲扣。
9、This pipe is made of carbon steel (stainless steel ,cast iron, plastic).
這管子是碳素鋼(不銹鋼、鑄鐵、塑料)制成的.。
10、We usually use elbow (bend, flange, tee, reducer) as a kind of pipe fitting.
我們常用彎頭(彎管、法蘭、三通、大小關(guān))作為一種管件。
4.工程建設(shè)英語口語句子
1. 混合結(jié)構(gòu) mixed structure
不同材料的構(gòu)件或部件混合組成的結(jié)構(gòu)。
2. 板柱結(jié)構(gòu) slab-column system
由樓板和柱(無梁)組成承重體系的房屋結(jié)構(gòu),如升板結(jié)構(gòu)、無梁樓蓋結(jié)構(gòu)、整體預(yù)應(yīng)力板柱結(jié)構(gòu)。
3. 框架結(jié)構(gòu) frame structure
由梁柱組成的能承受豎向、水平作用所產(chǎn)生各種效應(yīng)的單層、多層或高層結(jié)構(gòu)。
4. 拱結(jié)構(gòu) arch structure
由拱作為承承重體系的結(jié)構(gòu)。
5. 折板結(jié)構(gòu) folded-plate structure
由多塊條形或其它外形的平板組合而成,能作承重、圍護(hù)用的薄壁空間結(jié)構(gòu)。
6. 殼體結(jié)構(gòu) shell structure
由各種形狀的曲面板與邊緣構(gòu)件(梁、拱、桁架)組成的大跨度覆蓋或圍護(hù)的空間結(jié)構(gòu)。
7. 風(fēng)架結(jié)構(gòu) space truss structure
由多根桿件按一定網(wǎng)格形式通過節(jié)點(diǎn)連接而成的大跨度覆蓋的空間結(jié)構(gòu)。
8. 懸索結(jié)構(gòu) cable-suspended structure
由柔性受拉索及其邊緣構(gòu)件所組成的承重結(jié)構(gòu)。